| Title/Description |
Date |
Size |
Technical Bulletin No. 20
Previous Technical Bulletins; Updates to AutoCAD Standards and UDACS; Coating on Appurtenances in Vaults; Inspection Results Available On-Line for Development Inspections; Scheduling Inspections; Flushing of Mains; Call Before You Dig |
05-2006 |
186.81k |
Technical Bulletin No. 19
Placement of Grout in Casings;
Placement of Locator Balls on Water Facilities; Vault Construction;
GPS Data Collection; Use of Native Soil Material for Pipe Backfill;
Valve Box Cover Requirements |
08-2004 |
70.37k |
Technical Bulletin No. 18
Developer Agreement Time Limits; Avoid sexual harassment |
06-2001 |
13.25k |
Technical Bulletin No. 17
Uniform Design and
Construction Standards in Spanish; Inspection process feedback
requested; Compact Backflow Assembly–Proposed Detail
Drawing |
02-2001 |
37.26k |
Technical Bulletin No. 16
Turning Water Mains
Back on After Shutdown; Use of Native Soil Material for Pipe
Backfill; Internet Construction Assistance; District GPS Base
Station and Data Available for Public Use |
02-2000 |
24.73k |
Technical Bulletin No. 15
Water Service During Phased Construction; Water Plan Review
Acceptance Form; Angle Meter Stops; Hydraulic Analysis; Water
Plan Submittals with AutoCAD Files; Installation of Pressure
Reducing Valves |
09-1996 |
23.18k |
Technical Bulletin No. 14
Services in Driveways; Water Service During Phased
Construction |
05-1995 |
12.22k |
Technical Bulletin No. 13
Revised Service Rules; Effectiveness Assessment; Service
Removals;
1-inch Diameter Service Laterals |
12-1994 |
69.10k |
Technical Bulletin No. 12
Scheduling Inspection Services; Painting Large Meters
and Check Valves; Pressure Losses at Large Services |
07-1994 |
22.27k |
Technical Bulletin No. 11
Backflow prevention requirements upgraded; Water Service
During Phased Construction; 3" to 10" Diameter Backflow Assemblies
and Double Detector Checks; Disadvantaged Business Enterprise
Encouragement; New Rate for Inspection and Repair Service |
03-1994 |
13.90k |
Technical Bulletin No. 10
Developer Project Specifications Revised; Standard
Plates Revised; Water Service Lateral Damage |
11-1993 |
14.58k |
Technical Bulletin No. 9
Developer Project Specifications; Approved Materials
List; Pipeline Disinfection |
05-1993 |
13.77k |
Technical Bulletin No. 8
New Service Requirements; Specifications; New Product Approval;
Cadmium-plating Change; Mylars for Water Plans |
09-1992 |
14.53k |
Technical Bulletin No. 7
Backflow Prevention Assembly Specifications and Approved
Products List; Availability of Developer Specifications; Lack
of White Markings for Line Locators |
04-1992 |
13.70k |
Technical Bulletin No. 6
Approved Products and Manufacturers; Precast Vault Specifications;
Waterline Sizing and Oversizing Procedures; New and Revised
Standard Plates; Drawings requested in AutoCad format |
02-1992 |
13.51k |
Technical Bulletin No. 5
Approved Products and Manufacturers; Standard Specifications
and Plates; Revised Construction Specifications |
09-1991 |
11.75k |
Technical Bulletin No. 4
Policy on Deficient Work; Field Adjustments for Fire Hydrants;
New Standard Plates; Approved Products and Manufacturers;
Water Commitment Regulations |
06-1991 |
154.65k |
Technical Bulletin No. 3
Backflow Assemblies; Approved Products and Materials; Plans
Submittals; Limits to Flushing New Water Lines; Water Service
Commitment Regulations |
05-1991 |
14.80k |
Technical Bulletin No. 2
Service Rules Reminder; Inspection Requests; New fire service
meters approved; Contractor-caused Damage; Specifications
for Sleeve-type Couplings |
02-1991 |
11.75k |
Technical Bulletin No. 1
ACP Collars Unallowed; New Standard Plates; Ductile Iron Pipe
Approved; Engineering Department Reorganization |
01-1991 |
12.29k |